The ring dike was closed on October 29, 1620, after which the draining process could commence. The polder covers an area of 2,756 hectares. Part of the reclamation project was the headland known as De Nes on the southwest side; in the early 20th century, the peat there was excavated to more or less the level of the surrounding area within the polder.
The polder was drained by five series of three paddle-wheel windmills. The Purmer Gedenkboek 1622–1922 contains relevant information about the reclamation process; for instance, it notes that Jan Adriaensz. Leeghwater served as supervisor during the construction and installation of the windmills. To mark the Purmer’s tercentenary in 1922, he was honoured with a monument in the polder.
The polder's water management system originally consisted of a main canal with transverse canals and parcel ditches running perpendicular to it. The five series of windmills were situated at the ends of the transverse canals, near the ring dike. All of them discharged into the ring canal, which had a water level of approximately 0.50 m above MSL (Mean Sea Level). The long, relatively narrow parcels are a striking feature.
Following the reclamation, the polder comprised in 1637 three sections: the Kleine Polder, Grote Polder, and Monnikendammer Polder. Within these sections, there were - and still are - higher water levels in specific sub-areas. In 1683, summer water levels of 4.13, 4.48, and 4.28 m below MSL were reportedly maintained in these sections, respectively; however, these values may be too low when compared to later data found on the Waterstaat maps. On the first edition of the Waterstaat map, dating from around 1870, these sections show summer water levels of 3.87, 4.14, and 3.90 m below MSL, respectively.
In 1923, summer and winter water levels were set at 4.23/4.28, 4.43/4.48, and 4.42/4.48 m below MSL, respectively. By 1968, these levels had been slightly lowered to 4.33, 4.53, and 4.53 m below MSL, respectively. Currently, large parts of the polder have fixed water levels of 4.60 and 5.02 m below MSL, respectively. The urban area on the western side of the polder has a summer water level of 4.28 m below MSL and a winter water level of 4.34 m below MSL.
In 1655, two of the series of windmills were extended to comprise four paddle-wheel mills. Over the years, the paddle-wheels in several of the mills were replaced by Archimedean screws. In 1877, the Purmer Noord steampower pumping station - equipped with two centrifugal pumps - was built at the northern end of the polder, at the end of the Middeltocht canal; however, three series of windmills were retained. The steampower pumping station was upgraded in 1908, and a second engine was added. Both engines drove two centrifugal pumps, providing a total capacity of 125 m³ per minute - equivalent to 6.5 millimetres of water removal per day across the polder's surface area. The series of windmills were taken out of service at that time.
In 1952, one of the steam engines was replaced by a diesel engine, and in 1955, the other steam engine was replaced by an electric motor. The pumping station was renovated in 2012, with the pumping equipment replaced by two electric motors driving vertical screw pumps, providing a total capacity of 130 m³/minute. In 1992, the De Purmer Zuid pumping station - with a capacity of 135 m³/minute - was added on the southeast side of the polder, followed finally in 2016 by the Purmer Stedelijk pumping station on the west side, with a capacity of 60 m³/minute. This brought the total capacity to 325 m³/minute, or 17 millimetres per day.
For a long time, land use in the polder was agricultural. Although a number of country estates were established there, they gradually disappeared. When the city of Purmerend was designated as a growth centre in the 1960s, a significant portion of the new residential areas was developed in the western part of the Purmer.
Three safety levels currently apply to the ring dike. Roughly speaking, the risk of failure on the eastern side is based on a Class II regional flood defence (corresponding to a failure probability of 1/30 per year); on the northern side, it is Class III (1/100 per year); and on the western side - where the urban area is located - it is Class V (1/1000 per year). The area behind the Class II dike constitutes the lowest-lying part of the polder. Model calculations indicate that if this dike were to breach, the sections of the polder with higher safety levels would not be flooded.